VIOLET #1-31
API 3501123214 · Blaine County, Oklahoma
PATM
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEPATMSpudded
2007-05-13
Drilling finished
2007-06-17
Completed
2007-10-05
Recompleted
2017-08-15
First production
2008-03-20
Total depth
9,925 ft
Operator
BOSTICK SERVICES CORPORATION
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| TONKAWA | COMM DISP | 6,954–6,988 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | N-80 | 9,260 | 580 |
| LINER | 3 1/2 | 9.300000000000001 | L-80 | 762 | 100 |
| CONDUCTOR | 16 | — | — | 40 | 10 |
| SURFACE | 8 5/8 | 24 | J-55 | 1,016 | 585 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2007-05-03
WRADRPermit API
35011232140000
Operator
CONTINENTAL RESOURCES INC
Well type
TM
Approved
2007-05-03
Expires
2007-11-03
Proposed depth
10,000 ft
Surface casing
1,050 ft
Ground elevation
1,471 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 8,670 |
| RED FORK | 9,140 |
| SKINNER | 9,240 |
| ATOKA-MORROW | 9,395 |
| SPRINGER | 9,640 |
| CHESTER | 9,980 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.818750, -98.416667
35.81875, -98.41667 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Blaine County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.