CHARDONNAY #8-25H

API 3501123485 · Blaine County, Oklahoma

ACGAS
API
3501123485
Operator
COTERRA ENERGY OPERATING CO.
County
Blaine

Completions

Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.

Completion 0

ACGAS
Spudded
2012-10-08
Drilling finished
2012-11-09
Completed
2013-04-02
First production
2013-03-22
Total depth
17,495 ft
Operator
COTERRA ENERGY OPERATING CO.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
—————0

Completion 0

HORIZONTAL HOLEACGAS
Spudded
2012-10-08
Drilling finished
2012-11-09
Completed
2013-04-02
First production
2013-03-22
Total depth
17,495 ft
Operator
COTERRA ENERGY OPERATING CO.

Interval

FormationProducedPerforated (ft)Treatment
WOODFORDGAS12,772–17,419Frac

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-04-24171,34019161.44,67118/64

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/223P-11017,4951,680
INTERMEDIATE9 5/840P-11010,2921,570
CONDUCTOR20——709
SURFACE13 3/854.5J-551,522890

Drilling permit

Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2012-09-05

WRADRHorizontal hole
Permit API
35011234850000
Operator
COTERRA ENERGY OPERATING CO.
Well type
GAS
Approved
2012-09-05
Expires
2013-03-05
Proposed depth
17,476 ft
Proposed measured depth
17,495 ft
Proposed true vertical depth
12,822 ft
Proposed lateral
4,346 ft
Surface casing
1,500 ft
Ground elevation
1,454 ft

Target formations

FormationExpected top (ft)
MISSISSIPPI LM12,000
WOODFORD12,624
HUNTON12,794

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

35.666681, -98.318186

35.66668, -98.31819 · Surface location as filed with Oklahoma

Every well in Blaine County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.