SLO-POKE SWD #1
API 3501123776 · Blaine County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DCmInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| VIRGILIAN | COMM DISP | 5,678–6,737 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | HCL-80 | 6,841 | 1,295 |
| CONDUCTOR | 16 | — | — | 40 | 0 |
| SURFACE | 9.625999999999999 | 36 | J-55 | 521 | 210 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2017-04-07
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| VIOLA | 10,700 |
| SIMPSON | 10,950 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-04-07
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| VIRGILIAN | 4,850 |
| MISSOURIAN | 6,990 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.986080, -98.477430
Every well in Blaine County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.