HOPPIN #3

API 3501536431 · Caddo County, Oklahoma

AC2DCm
API
3501536431
Operator
CEMOIL INC
County
Caddo

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2DCm
Cumulative fluid injected
0 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202500
Nov 202500
Oct 202500
Sep 202500
Aug 202500
Jul 202500
Jun 202500
May 202500
Apr 202500
Mar 202500
Feb 202500
Jan 202500

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 3

STRAIGHT HOLEAC2DCm
Spudded
1955-08-01
Drilling finished
1955-08-13
Completed
1955-08-22
Recompleted
2022-01-20
First production
1955-08-20
Total depth
4,085 ft
Operator
CEMOIL INC

Intervals

FormationProducedPerforated (ft)
FORTUNACOMM DISP2,006–2,185
CISCOCOMM DISP2,192–2,314
NOBLE-OLSONCOMM DISP3,126–3,541
GRIFFINCOMM DISP3,611–3,676
GARNERCOMM DISP3,772–3,976

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5.5——4,005450
SURFACE8——201165

Location

34.939139, -98.148389

34.93914, -98.14839 · Surface location as filed with Oklahoma

Every well in Caddo County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.