W.CEMENT (NILES 11) #10-11

API 3501536502 · Caddo County, Oklahoma

ACOIL
API
3501536502
Operator
CITATION OIL & GAS CORP
County
Caddo

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 2

STRAIGHT HOLEACOIL
Spudded
1949-01-15
Drilling finished
1949-02-11
Completed
1949-02-14
Recompleted
2014-03-05
First production
1949-02-13
Total depth
3,283 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedPerforated (ft)Treatment
PERMIANOIL1,444–3,218Acid

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2014-03-0513115141360—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION6 5/819.5B3,232600
SURFACE10 3/432.75H-40305250

Location

34.950135, -98.212780

34.95014, -98.21278 · Surface location as filed with Oklahoma

Every well in Caddo County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.