APACHE BROMIDE S.U(LEWIS#4) #11-4
API 3501537148 · Caddo County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1946-11-07
Drilling finished
1947-02-13
Completed
1947-02-20
Recompleted
2011-10-19
First production
1947-02-19
Total depth
3,832 ft
Operator
HIGHLINE OPERATING, LLC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| 1ST BROMIDE | OIL | 3,549–3,664 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-11-16 | 21 | 0 | 1,677 | — | 0 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9" | 40 | — | 2,865 | 1,000 |
| PRODUCTION | 5 1/2 | 20 | — | 3,831 | 1,000 |
| SURFACE | 13 3/8" | 48 | H-40 | 763 | 800 |
Location
34.932181, -98.439325
34.93218, -98.43932 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Caddo County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.