WEST CEMENT UNIT (L.L. EDWARDS 13) #2-13
API 3501537372 · Caddo County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Injection zone
PERMIAN-HOXBAR
Cumulative fluid injected
10,666 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 55 |
| Nov 2025 | 0 | 110 |
| Oct 2025 | 0 | 110 |
| Sep 2025 | 0 | 311 |
| Aug 2025 | 0 | 311 |
| Jul 2025 | 0 | 355 |
| Jun 2025 | 0 | 580 |
| May 2025 | 0 | 855 |
| Apr 2025 | 1,811 | 1,340 |
| Mar 2025 | 2,729 | 1,355 |
| Feb 2025 | 1,257 | 1,360 |
| Jan 2025 | 4,869 | 1,360 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2RInSpudded
1949-01-15
Drilling finished
1949-02-13
Completed
1949-02-17
Recompleted
1965-03-18
Total depth
3,526 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| FORTUNA | INJ | 2,043–2,350 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 6 5/8 | 19.5 | — | 3,464 | 500 |
| SURFACE | 10 3/4 | 32.75 | — | 385 | 250 |
Completion 2
STRAIGHT HOLEAC2RInSpudded
1949-01-15
Drilling finished
1949-02-13
Completed
1949-02-17
Recompleted
2023-11-04
Total depth
3,526 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| FORTUNA | INJ | 2,043 | 2,022–2,396 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 6 5/8 | 19.5 | — | 3,464 | 500 |
| SURFACE | 10 3/4 | 32.75 | — | 385 | 250 |
Location
34.940605, -98.208459
34.94060, -98.20846 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Caddo County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.