MACH #1
API 3501721303 · Canadian County, Oklahoma
PAOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEPAOILSpudded
1979-09-17
Drilling finished
1979-10-23
Completed
1979-11-30
First production
1979-12-02
Total depth
9,520 ft
Operator
CITIZEN ENERGY II LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MISSISSIPPI LIME | OIL | 8,806–8,884 |
| WOODFORD | OIL | 8,910–8,924 |
| HUNTON | OIL | 9,030–9,310 |
| VIOLA | OIL | 9,428–9,475 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1979-11-30 | 175 | 450 | 300 | 48 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | K-55 & N-80 | 9,325 | 660 |
| CONDUCTOR | 16 | — | — | — | 50 |
| SURFACE | 8 5/8 | 24 | K-55 | 1,225 | 600 |
Location
35.487958, -97.810710
35.48796, -97.81071 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.