KAPLAN #2-1
API 3501721846 · Canadian County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1980-09-12
Drilling finished
1980-10-17
Completed
1980-11-17
First production
1980-11-02
Total depth
9,976 ft
Operator
BCE-MACH II LLC
Intervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| REDFORK | OIL | 8,430–8,577 | Acid, Frac |
| HUNTON | OIL | 8,990–9,356 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1980-11-14 | 85 | 760 | 25 | — | 0 | 18/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17# | N-80 | 9,976 | 900 |
| SURFACE | 8 5/8 | 24 | K-55 | 1,225 | 700 |
Location
35.462843, -97.797528
35.46284, -97.79753 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.