GILMORE #1-22
API 3501722639 · Canadian County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEACOILSpudded
1983-12-14
Drilling finished
1984-01-02
Completed
1984-03-17
First production
1984-02-01
Total depth
7,470 ft
Operator
ALVARADO 2014 LLC
Intervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| OSWEGO | OIL | 6,866–6,872 | Acid, Frac |
| PRUE | OIL | 6,934–6,944 | Acid, Frac |
| BARTLESVILLE | OIL | 7,080–7,084 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-05-03 | 6 | 10 | 2 | 41 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 5 1/2 | 15.5 | K-55 | 6,994 | 300 |
| PRODUCTION | 5 1/2 | 17 | K-55 | 453 | 0 |
| SURFACE | 8 5/8 | 24 | K-55 | 809 | 430 |
Location
35.680150, -97.725206
35.68015, -97.72521 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.