LOUIS J. ROHR #1
API 3501723175 · Canadian County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| HUNTON | GAS | 7,064–7,122 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2016-07-07 | 0 | 32 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | N-80 | 7,870 | 400 |
| SURFACE | 8 5/8 | 24 | J-55 | 700 | 250 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1990-08-31
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| PRUE | 6,600 |
| PINK LM | 6,650 |
| SKINNER | 6,700 |
| RED FORK | 6,750 |
| BARTLESVILLE | 6,800 |
| MISSISSIPPI | 6,880 |
| HUNTON | 7,140 |
| VIOLA | 7,550 |
| WILCOX 1 | 7,750 |
| WILCOX 2 | 7,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.717414, -97.690704
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.