WILLIS #2-25H
API 3501724055 · Canadian County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
HORIZONTAL HOLEACOILProduction test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2015-12-14 | 0 | 86 | 20 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | L-80 | 7,630 | 400 |
| LINER | 4 1/2 | — | — | 4,204 | 0 |
| SURFACE | 9 5/8 | 36 | J-55 | 1,010 | 455 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-06-27
WRADRHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| HUNTON | 7,511 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Application
REJAMHorizontal holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| HUNTON | 7,511 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.666434, -97.686753
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.