DENNIS #1-20SWD
API 3501724301 · Canadian County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 88,706 | 1,000 |
| Nov 2025 | 127,328 | 1,200 |
| Oct 2025 | 298,853 | 1,200 |
| Sep 2025 | 165,158 | 1,150 |
| Aug 2025 | 170,332 | 1,175 |
| Jul 2025 | 342,711 | 1,200 |
| Jun 2025 | 355,737 | 1,175 |
| May 2025 | 393,319 | 1,175 |
| Apr 2025 | 379,903 | 1,175 |
| Mar 2025 | 377,668 | 1,175 |
| Feb 2025 | 322,713 | 1,175 |
| Jan 2025 | 385,494 | 1,175 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2DCmIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SHAWNEE | COMM DISP | 5,150–6,342 | Acid |
| DOUGLAS | COMM DISP | 6,356–6,426 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 8 5/8 | 32 | N-80 | 6,779 | 1,750 |
| CONDUCTOR | 20 | — | — | 50 | 8 |
| SURFACE | 13 3/8 | 48 | H-40 | 1,023 | 800 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-09-14
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SHAWNEE | 5,135 |
| DOUGLAS GP | 6,360 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.673602, -98.075731
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.