BATTLESHIP 1-12-10-7 #2MXH
API 3501725482 · Canadian County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISSISSIPPI LIME | OIL | 10,500–15,610 | Acid, Frac |
| MISSISSIPPIAN | OIL | 15,646–20,507 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2020-03-21 | 343 | 2,485 | 773 | 52 | 0 | 24 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 20 | P-110 | 20,605 | 2,445 |
| CONDUCTOR | 16 | 55 | — | 60 | 0 |
| SURFACE | 9.625 | 40 | J-55 | 504 | 250 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2019-06-12
WRADRHHMUTarget formations
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 9,792 |
| MISSISSIPPI LM | 10,174 |
| WOODFORD | 10,418 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.377956, -97.891345
Every well in Canadian County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.