BEARD 34_3-13N-9W #1HX
API 3501725950 · Canadian County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACGASIntervals
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| MISSISSIPPIAN | GAS | 10,755 | 12,155–17,055 | Frac |
| MISSISSIPPI | GAS | 10,720 | 17,055–22,046 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2024-06-16 | 247 | 7,018 | 1,441 | 55.5 | 2,186 | 20 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 8 5/8" | 32# | P-110 | 10,315 | 630 |
| PRODUCTION | 5 1/2" | 20# | P-110 | 22,223 | 1,865 |
| SURFACE | 13 3/8" | 54.5# | J-55 | 1,002 | 520 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2023-04-11
WRADRMUTarget formations
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 10,720 |
| MISSISSIPPI | 11,810 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.564942, -98.144167