COSTELLO #2
API 3501902986 · Carter County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1946-06-13
Drilling finished
1946-06-23
Completed
1946-06-27
First production
1946-08-02
Total depth
2,866 ft
Operator
BARBOUR ENERGY CORPORATION
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| TUSSY | OIL | 2,678–2,820 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1946-08-02 | 43 | 0 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 20 | 8RD | 2,846 | 150 |
| SURFACE | 10 3/4 | — | — | 60 | 65 |
Location
34.487865, -97.522031
34.48786, -97.52203 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.