SOUTH TATUMS SAND UNIT (HOPSON 8) #5-8

API 3501903479 · Carter County, Oklahoma

AC2RIn
API
3501903479
Operator
MACK ENERGY CO.
County
Carter

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
HOXBAR|PENNSYLVANIAN SD|TATUMS
Cumulative fluid injected
440,291 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202537,734200
Nov 202538,368200
Oct 202538,095200
Sep 202536,782200
Aug 202537,228200
Jul 202537,228200
Jun 202533,826192
May 202538,193200
Apr 202534,515200
Mar 202537,400200
Feb 202533,787200
Jan 202537,135200

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 2

STRAIGHT HOLEAC2RIn
Spudded
1934-01-01
Drilling finished
1934-07-01
Completed
1934-07-01
Recompleted
1983-05-12
First production
1934-07-01
Total depth
2,747 ft
Operator
MACK ENERGY CO.

Interval

FormationProducedPerforated (ft)
TATUMSINJ2,618–2,692

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/220S-702,70685
INTERMEDIATE8 5/832—2,611335
SURFACE12.550—3475

Location

34.442503, -97.464993

34.44250, -97.46499 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.