MERRICK #2-A
API 3501904068 · Carter County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1947-08-28
Drilling finished
1947-08-30
Completed
1947-10-31
Recompleted
1995-10-09
Total depth
1,899 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| DES MOINES | OIL | 1,792–1,860 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1995-10-09 | 9 | 0 | 40 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 10 | — | — | 20 | 3 |
| PRODUCTION | 7 | — | — | 1,790 | 500 |
Location
34.398288, -97.416003
34.39829, -97.41600 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.