HARRELL ESTATE (FEE) #2-3

API 3501904375 · Carter County, Oklahoma

ACOIL
API
3501904375
Operator
CITATION OIL & GAS CORP
County
Carter

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 3

STRAIGHT HOLEACOIL
Spudded
1948-07-06
Drilling finished
1948-07-15
Completed
1948-08-17
Recompleted
2022-09-14
First production
1948-08-07
Total depth
1,835 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedTop (ft)Perforated (ft)Treatment
DEESEOIL1,2941,294–1,632Frac

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2022-10-1180196—00

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION7——1,655200
SURFACE10 3/4——2420

Location

34.368632, -97.393864

34.36863, -97.39386 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.