GRAHAM DEESE UNIT (SPARKS 8) #56-8

API 3501904529 · Carter County, Oklahoma

AC2RIn
API
3501904529
Operator
CITATION OIL & GAS CORP
County
Carter

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
DEESE
Cumulative fluid injected
409,075 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202535,0081,375
Nov 202534,0211,375
Oct 202534,2971,375
Sep 202533,5351,375
Aug 202534,8811,375
Jul 202532,7521,375
Jun 202533,5751,350
May 202535,7911,350
Apr 202533,0291,350
Mar 202535,9741,350
Feb 202531,9201,350
Jan 202534,2921,350

A dash is a month the well filed with no figure in that column.

Completions

Oklahoma files 2 completion reports for this well.

Completion 0

STRAIGHT HOLEAC2RIn
Spudded
1961-06-06
Drilling finished
1961-06-24
Completed
1961-06-24
First production
1961-06-24
Total depth
3,956 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedPerforated (ft)
DEESEINJ1,867–3,560

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/215.5—3,955650
SURFACE9 5/825.4—171165

Completion 0

AC2RIn
Spudded
1961-06-06
Completed
1961-07-19
Total depth
3,956 ft
Operator
CITATION OIL & GAS CORP

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
—————0

Location

34.347900, -97.449468

34.34790, -97.44947 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.