HEWITT UNIT (WALKER 1, W. VOORHEES 2) #21-1101

API 3501906781 · Carter County, Oklahoma

AC2RIn
API
3501906781
Operator
XTO ENERGY INC
County
Carter

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
HOXBAR-DEESE
Cumulative fluid injected
1,240 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202500
Nov 20251,229300
Oct 202500
Sep 202500
Aug 202500
Jul 202511500
Jun 202500
May 202500
Apr 202500
Mar 202500
Feb 202500
Jan 202500

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 3

STRAIGHT HOLEAC2RIn
Spudded
1920-03-26
Drilling finished
1920-06-19
Completed
1920-06-29
Recompleted
1969-06-20
First production
1920-06-29
Total depth
2,376 ft
Operator
XTO ENERGY INC

Intervals

FormationProducedPerforated (ft)
STEARNS /OKLA/INJ2,240–2,260
CHUBBEEINJ2,326–2,354

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
INTERMEDIATE8 1/4——1,900175
PRODUCTION6 5/8——2,346250
SURFACE15 1/4——14025

Location

34.199130, -97.416140

34.19913, -97.41614 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.