HEALDTON ARBUCKLE UNIT (MULLENS UNIT 1-3) #21-1

API 3501907166 · Carter County, Oklahoma

ACOIL
API
3501907166
Operator
CITATION OIL & GAS CORP
County
Carter

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 0

STRAIGHT HOLEACOIL
Spudded
1962-07-01
Drilling finished
1962-07-31
Completed
1962-08-17
Recompleted
1985-05-05
First production
1962-08-07
Total depth
4,003 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedPerforated (ft)
LOWER WEST SPRING CREEK - BROWN ZONEOIL3,074–3,176

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2019-03-091048937.50—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION4 1/29.5J-553,640190
CONDUCTOR13 3/8——400
SURFACE8 5/8——1,113601

Location

34.237338, -97.502135

34.23734, -97.50213 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.