JOINER CITY UNIT (HARRY JONES 1) #37

API 3501909765 · Carter County, Oklahoma

ACOIL
API
3501909765
Operator
SHADOWPEAK OPERATING LLC
County
Carter

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 1

STRAIGHT HOLEACOIL
Spudded
1959-08-01
Drilling finished
1959-10-03
Completed
1959-10-19
Recompleted
2009-11-05
First production
1959-10-14
Total depth
8,365 ft
Operator
SHADOWPEAK OPERATING LLC

Interval

FormationProducedPerforated (ft)
WOODFORDOIL7,320–7,460

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2009-11-10241471340.1500—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION723 AND 26N-808,349175
SURFACE10 3/432.75N-40345350

Location

34.159158, -97.506210

34.15916, -97.50621 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma