HEALDTON II WATERFLOOD UNIT #C-5-I
API 3501913803 · Carter County, Oklahoma
AC2RIN
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIN
Injection zone
HEALDTON
Cumulative fluid injected
250,528 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 22,072 | 55 |
| Nov 2025 | 9,857 | 95 |
| Oct 2025 | 20,421 | 95 |
| Sep 2025 | 20,734 | 10 |
| Aug 2025 | 23,905 | 10 |
| Jul 2025 | 23,283 | 10 |
| Jun 2025 | 22,436 | 10 |
| May 2025 | 22,689 | 10 |
| Apr 2025 | 21,958 | 10 |
| Mar 2025 | 21,580 | 10 |
| Feb 2025 | 19,740 | 10 |
| Jan 2025 | 21,853 | 10 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 0
STRAIGHT HOLEAC2RINSpudded
1914-01-01
Drilling finished
1914-01-02
Completed
1914-01-03
Recompleted
2025-11-20
Total depth
1,178 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HEALDTON | INJ | 1,100–1,178 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 625 | 250 |
| SURFACE | 8 5/8 | — | — | 641 | 150 |
Completion 1
STRAIGHT HOLEAC2RINSpudded
1914-01-01
Drilling finished
1914-01-02
Completed
1914-01-03
Recompleted
1982-05-12
Total depth
1,178 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| HEALDTON | INJ | 1,100–1,178 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 625 | 250 |
| SURFACE | 8 5/8 | — | — | 641 | 150 |
Location
34.248140, -97.534610
34.24814, -97.53461 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.