HEALDTON I UNIT #3-77

API 3501921109 · Carter County, Oklahoma

ACOIL
API
3501921109
Operator
CITATION OIL & GAS CORP
County
Carter

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 1

STRAIGHT HOLEACOIL
Spudded
1972-12-04
Drilling finished
1972-12-14
Completed
1973-03-20
Total depth
1,510 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedPerforated (ft)Treatment
HEALDTONOIL1,043–1,172Acid

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
2013-03-14101,52532.50OPEN

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/215.5J-551,510325

Location

34.253796, -97.552626

34.25380, -97.55263 · Surface location as filed with Oklahoma

Every well in Carter County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.