HEALDTON IV UNIT (CC-20) #26-20
API 3501921158 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 55,546 | 500 |
| Nov 2025 | 53,571 | 500 |
| Oct 2025 | 55,765 | 500 |
| Sep 2025 | 53,265 | 500 |
| Aug 2025 | 54,935 | 500 |
| Jul 2025 | 53,668 | 500 |
| Jun 2025 | 28,952 | 500 |
| May 2025 | 31,134 | 500 |
| Apr 2025 | 29,543 | 500 |
| Mar 2025 | 52,647 | 590 |
| Feb 2025 | 55,286 | 590 |
| Jan 2025 | 63,935 | 590 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HEALDTON | INJ | 806–1,203 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-11-11 | 0 | 0 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 20 / 23 | J-55 | 1,247 | 400 |
Location
34.205139, -97.497127
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.