HEALDTON IV UNIT (27-23) #MF-23
API 3501923145 · Carter County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1985-01-16
Drilling finished
1985-01-18
Completed
1985-04-05
Recompleted
2012-03-31
First production
1985-04-05
Total depth
1,350 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HEALDTON | OIL | 1,104–1,239 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-03-31 | 1 | 0 | 176 | 31.3 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | K-55 | 1,348 | 325 |
| SURFACE | 8 5/8 | 24 | K-55 | 99 | 50 |
Location
34.200415, -97.501241
34.20041, -97.50124 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.