HEALDTON V UNIT (LUCY TUBBEE, BIA) #16-56
API 3501923426 · Carter County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1987-03-02
Drilling finished
1987-03-04
Completed
1987-03-13
Recompleted
2010-11-09
First production
1987-03-13
Total depth
1,355 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HEALDTON | OIL | 850–1,038 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-11-11 | 6 | 0 | 794 | 30.8 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | N-80 | 1,349 | 425 |
| SURFACE | 8.625 | 20 | K-55 | 42 | 35 |
Location
34.199420, -97.470270
34.19942, -97.47027 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.