SIMPSON-VOORHEES #35
API 3501924130 · Carter County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Cumulative fluid injected
140,137 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 9,197 | 200 |
| Nov 2025 | 9,548 | 200 |
| Oct 2025 | 9,289 | 200 |
| Sep 2025 | 10,796 | 200 |
| Aug 2025 | 13,609 | 150 |
| Jul 2025 | 14,051 | 150 |
| Jun 2025 | 12,929 | 100 |
| May 2025 | 13,505 | 100 |
| Apr 2025 | 12,606 | 150 |
| Mar 2025 | 12,782 | 100 |
| Feb 2025 | 11,075 | 200 |
| Jan 2025 | 10,750 | 200 |
A dash is a month the well filed with no figure in that column.
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1992-08-26
WRADRPermit API
35019241300001
Operator
EXXON MOBIL CORPORATION
Well type
2RIn
Approved
1992-08-26
Expires
1993-03-12
Proposed depth
3,550 ft
Surface casing
900 ft
Ground elevation
914 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| PONTOTOC | 700 |
| HOXBAR | 1,440 |
| DEESE | 3,410 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.221870, -97.411440
34.22187, -97.41144 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.