SWDU (HIGGINS 2) #16-1
API 3501924298 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 229 | 2,014 |
| May 2025 | 2,502 | 1,751 |
| Apr 2025 | 2,492 | 1,961 |
| Mar 2025 | 3,709 | 2,005 |
| Feb 2025 | 7,288 | 2,010 |
| Jan 2025 | 12,136 | 2,050 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| DEESE | OIL | 3,522–3,638 | Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,059 | 975 |
| SURFACE | 8 5/8 | 24 | K-55 | 1,353 | 590 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1994-10-11
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIAN SD | 1,330 |
| EASON | 2,900 |
| TUSSY | 2,950 |
| CARPENTER | 3,450 |
| MORRIS /DES MOINES/ | 3,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.401397, -97.448452
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.