WILDCAT JIM UNIT #13-A
API 3501924525 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 39,884 | 500 |
| Nov 2025 | 39,316 | 500 |
| Oct 2025 | 40,228 | 500 |
| Sep 2025 | 37,827 | 500 |
| Aug 2025 | 39,850 | 500 |
| Jul 2025 | 40,138 | 500 |
| Jun 2025 | 36,968 | 500 |
| May 2025 | 40,446 | 500 |
| Apr 2025 | 43,305 | 500 |
| Mar 2025 | 44,728 | 500 |
| Feb 2025 | 39,977 | 500 |
| Jan 2025 | 42,395 | 500 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 3
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| HOXBAR-DEESE | INJ | 1,347–2,795 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2" | 15.5 | K-55 | 2,860 | 620 |
| SURFACE | 8 5/8" | 24 | J-55 | 1,307 | 680 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 1997-05-20
WRADRTarget formation
| Formation | Expected top (ft) |
|---|---|
| HOXBAR-DEESE | 1,440 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 1997-05-20
WRAAMTarget formation
| Formation | Expected top (ft) |
|---|---|
| HOXBAR-DEESE | 1,405 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.402734, -97.433630
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.