COX PENN SAND UNIT #103
API 3501924967 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 25,163 | 330 |
| Nov 2025 | 23,836 | 330 |
| Oct 2025 | 24,454 | 330 |
| Sep 2025 | 23,242 | 330 |
| Aug 2025 | 24,419 | 330 |
| Jul 2025 | 22,931 | 330 |
| Jun 2025 | 23,637 | 340 |
| May 2025 | 23,811 | 330 |
| Apr 2025 | 22,198 | 330 |
| Mar 2025 | 24,782 | 320 |
| Feb 2025 | 21,075 | 310 |
| Jan 2025 | 24,232 | 290 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| PENN SD | INJ | 1,014–1,421 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 2,128 | 500 |
| SURFACE | 8 5/8 | 24 | J-55 | 90 | 100 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2006-03-16
WRADRTarget formation
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIAN SD | 1,030 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2006-08-22
WRAAMTarget formation
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIAN SD | 1,030 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.379203, -97.402498
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.