SOUTHEAST TATUMS UNIT (WOLFE 7) #5-7
API 3501925155 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 24,590 | 290 |
| Nov 2025 | 23,150 | 290 |
| Oct 2025 | 22,093 | 290 |
| Sep 2025 | 21,324 | 220 |
| Aug 2025 | 21,979 | 220 |
| Jul 2025 | 15,968 | 220 |
| Jun 2025 | 15,015 | 170 |
| May 2025 | 15,669 | 170 |
| Apr 2025 | 14,615 | 180 |
| Mar 2025 | 15,956 | 180 |
| Feb 2025 | 12,658 | 180 |
| Jan 2025 | 15,963 | 200 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| DEESE | INJ | 1,053–1,388 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 8 5/8 | — | — | 96 | 70 |
| PRODUCTION | 5 1/2 | 15.5# | J-55 | 1,465 | 240 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-02-29
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| DEESE | 1,005 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.366082, -97.390394
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.