BLIND MOOSE #3-20
API 3501925687 · Carter County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| TUSSY | OIL | 6,296–6,310 | Acid, Frac |
| CARPENTER | OIL | 6,569–6,712 | Acid, Frac |
| MORRIS /DES MOINES/ | OIL | 6,802–6,857 | Acid, Frac |
| VIOLA | OIL | 7,104–7,819 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-07-02 | 0 | 0 | 0 | — | 1,967 | — |
| 2012-07-04 | 130 | 0 | 445 | — | 2,211 | 35/64 |
| 2012-08-17 | 40 | 399 | 125 | 29 | 1,500 | 12/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 & 20 | P-110, S-95, N-80 | 7,944 | 625 |
| CONDUCTOR | 16 | — | — | 40 | 7 |
| SURFACE | 9 5/8 | 36 & 40 | K-55 | 938 | 400 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-04-04
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| HOXBAR | 4,000 |
| FUSULINA UP | 5,200 |
| FUSULINA LOW | 5,300 |
| TUSSY | 6,400 |
| CARPENTER | 6,700 |
| MORRIS /DES MOINES/ | 6,850 |
| DORNICK HILLS | 7,000 |
| HUNTON | 7,100 |
| VIOLA | 7,550 |
| BROMIDE | 8,350 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.279917, -97.437167
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.