RABE #1-17
API 3501926150 · Carter County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
DIRECTIONAL HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| LONE GROVE LOW | OIL | 7,910–7,940 | Acid, Frac |
| FUSULINID UP | OIL | 8,300–8,758 | Acid, Frac |
| FUSULINID LOW | OIL | 9,196–9,563 | Acid, Frac |
| TUSSY UP (EASON) | OIL | 9,764–9,876 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2015-03-13 | 195 | 49 | 105 | 40.1 | 0 | 64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | — | — | — | 45 | 7 |
| PRODUCTION | 5 1/2 | 17 | P-110 | 9,959 | 1,780 |
| SURFACE | 8 5/8 | 24 | J-55 | 913 | 445 |
Drilling permits
Oklahoma files 4 applications to drill this well, naming 20 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2014-12-05
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BAYOU | 3,700 |
| CHUBBEE | 4,000 |
| LONE GROVE UP | 5,200 |
| LONE GROVE MID | 5,800 |
| LONE GROVE LOW | 6,000 |
| FUSULINID UP | 6,200 |
| FUSULINID LOW | 6,900 |
| TUSSY UP (EASON) | 7,400 |
| TUSSY LOW (HEFNER) | 7,700 |
| DORNICK HILLS | 8,200 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-12-05
EXTAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| LONE GROVE LOW | 6,000 |
| FUSULINID UP | 6,200 |
| FUSULINID LOW | 6,900 |
| TUSSY UP (EASON) | 7,400 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-12-05
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| FUSULINID LOW | 6,900 |
| TUSSY UP (EASON) | 7,400 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-12-05
WRAAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| LONE GROVE LOW | 7,870 |
| FUSULINID UP | 8,240 |
| FUSULINID LOW | 9,017 |
| TUSSY UP (EASON) | 9,648 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.207792, -97.333255
Every well in Carter County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.