ROSE #1
API 3501926369 · Carter County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 6,987 | 1,100 |
| Nov 2025 | 8,657 | 1,100 |
| Oct 2025 | 9,646 | 1,100 |
| Sep 2025 | 7,634 | 1,100 |
| Aug 2025 | 5,949 | 900 |
| Jul 2025 | 2,635 | 900 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 2,135 | 950 |
| Feb 2025 | 5,145 | 950 |
| Jan 2025 | 5,795 | 950 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
SERVICE WELLAC2DNCInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| DEESE | DISP | 3,530–3,640 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 4,449 | 625 |
| SURFACE | 8 5/8 | 24 | J-55 | 637 | 330 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2020-02-12
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PONTOTOC | 600 |
| HOXBAR | 900 |
| DEESE | 2,500 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.182952, -97.390629
Every well in Carter County, Oklahoma