WOODS #1-16
API 3502921228 · Coal County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.
Completion 0
STRAIGHT HOLEPANTIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| VIOLA | OIL | 5,018–5,146 | Acid, Frac |
| MCLISH | DRY | 5,388–5,608 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-02-14 | 0 | 0 | 82 | — | 250 | 64/64 |
| 2012-03-22 | 2 | 0 | 225 | 37 | 520 | 64/64 |
| 2012-05-25 | 22 | 15 | 65 | 37 | 550 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 15.5 | J-55 | 6,001 | 450 |
| CONDUCTOR | 16 | 42 | X-42 | 40 | 9 |
| SURFACE | 9.625 | 36 | J-55 | 585 | 300 |
Completion 1
STRAIGHT HOLEPANTIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | GAS | 4,796–4,812 | Acid, Frac |
| VIOLA | OIL | 5,018–5,158 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2013-03-30 | 3 | 8 | 20 | 37 | 520 | 64/64 |
| 2013-04-02 | 0 | 12 | 0 | — | 600 | 24/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 15.5 | J-55 | 6,001 | 450 |
| CONDUCTOR | 16 | 42 | X-42 | 40 | 9 |
| SURFACE | 9.625 | 36 | J-55 | 585 | 300 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-12-13
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| ATOKA | 2,650 |
| WAPANUCKA | 2,900 |
| CROMWELL | 3,200 |
| HUNTON | 4,250 |
| VIOLA | 4,750 |
| BROMIDE | 5,000 |
| MCLISH | 5,200 |
| OIL CREEK | 5,600 |
| ARBUCKLE | 6,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2013-03-28
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| HUNTON | 4,590 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.549676, -96.471122
Every well in Coal County, Oklahoma