WATSON #1-P
API 3503100649 · Comanche County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1959-06-28
Drilling finished
1959-06-29
Completed
1959-08-12
First production
1959-07-20
Total depth
1,894 ft
Operator
JOHNSON FAMILY TRUST
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| GRANITE WASH | OIL | 1,690–1,702 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1959-07-20 | 20 | 0 | 0 | 39 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | — | — | 1,801 | 225 |
| SURFACE | 8 5/8 | — | — | 48 | 40 |
Location
34.634441, -98.198731
34.63444, -98.19873 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Comanche County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.