SE JENNINGS RED FORK SAND UNIT (ROWSEY 2) #24
API 3503712870 · Creek County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Injection zone
RED FORK
Cumulative fluid injected
6,300 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 525 | 150 |
| Nov 2025 | 525 | 150 |
| Oct 2025 | 525 | 150 |
| Sep 2025 | 525 | 150 |
| Aug 2025 | 525 | 150 |
| Jul 2025 | 525 | 150 |
| Jun 2025 | 525 | 150 |
| May 2025 | 525 | 150 |
| Apr 2025 | 525 | 150 |
| Mar 2025 | 525 | 150 |
| Feb 2025 | 525 | 150 |
| Jan 2025 | 525 | 150 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2RInSpudded
1957-02-13
Drilling finished
1957-02-23
Completed
1957-02-23
Recompleted
1960-01-01
First production
1957-02-23
Total depth
2,785 ft
Operator
CAMO OIL LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SKINNER | DISP | 2,610–2,620 |
| RED FORK | DISP | 2,724–2,729 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 2,777 | 95 |
| SURFACE | 10 3/4 | — | — | 109 | 115 |
Completion 2
STRAIGHT HOLEAC2RInSpudded
1957-02-13
Drilling finished
1957-02-23
Completed
1957-02-23
Recompleted
1960-01-01
Total depth
2,783 ft
Operator
CAMO OIL LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| RED FORK | INJ | 2,724–2,729 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 9.5 | J-55 | 2,777 | 0 |
| SURFACE | 10 3/4 | 25 | J-55 | 109 | 115 |
Location
36.151270, -96.511230
36.15127, -96.51123 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.