YARHOLA ROYALTY UNIT (C KEY WSW-1) #WSW-1
API 3503720634 · Creek County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 36,806 | 0 |
| Nov 2025 | 66,230 | 0 |
| Oct 2025 | 78,110 | 0 |
| Sep 2025 | 87,700 | 0 |
| Aug 2025 | 78,632 | 0 |
| Jul 2025 | 82,468 | 0 |
| Jun 2025 | 62,228 | 0 |
| May 2025 | 54,218 | 0 |
| Apr 2025 | 54,290 | 0 |
| Mar 2025 | 44,292 | 0 |
| Feb 2025 | 24,948 | 0 |
| Jan 2025 | 34,202 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 2
STRAIGHT HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 8 5/8 | 32 | J-55 | 3,146 | 855 |
| PRODUCTION | 5 1/2 | 17 | K-55 | 3,308 | 480 |
| SURFACE | 13 | 48 | SH | 228 | 240 |
Completion 3
SERVICE WELLAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 8.625" | 32# | J-55 | 3,146 | 855 |
| PRODUCTION | 5.5 | 17# | K-55 | 3,308 | 480 |
| SURFACE | 13" | 48# | SH | 228 | 240 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-06-11
WRAREStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| SIMPSON | 2,782 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.960610, -96.580720
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.