MILLER (MILLER 0-2) #2B
API 3503728778 · Creek County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 320 | 120 |
| Nov 2025 | 80 | 100 |
| Oct 2025 | 80 | 150 |
| Sep 2025 | 8 | 75 |
| Aug 2025 | 5 | 70 |
| Jul 2025 | 8 | 75 |
| Jun 2025 | 8 | 75 |
| May 2025 | 8 | 75 |
| Apr 2025 | 8 | 75 |
| Mar 2025 | 8 | 75 |
| Feb 2025 | 25 | 90 |
| Jan 2025 | 10 | 80 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| LAYTON | INJ | 930–956 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 9.5 | — | 2,513 | 120 |
| SURFACE | 7 | 17 | — | 790 | 48 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-03-25
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 1,932 |
| SKINNER | 2,190 |
| BARTLESVILLE | 2,387 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.125054, -96.439718
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.