DOOLIN #3-1
API 3503728840 · Creek County, Oklahoma
ACDRY
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEACDRYSpudded
2009-05-28
Drilling finished
2009-06-04
Completed
2009-06-09
First production
2009-06-01
Total depth
2,793 ft
Operator
BSO INC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | DRY | 2,724–2,750 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 2,793 | 125 |
| SURFACE | 8 5/8 | — | — | 271 | 175 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 6 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2009-05-11
WRADRStraight holePermit API
35037288400000
Operator
SPARKS MICK OIL COMPANY INC
Well type
DRY
Approved
2009-05-11
Expires
2009-11-11
Proposed depth
3,300 ft
Surface casing
1,000 ft
Ground elevation
867 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 2,250 |
| PRUE | 2,406 |
| SKINNER | 2,524 |
| RED FORK | 2,650 |
| BARTLESVILLE | 2,690 |
| MISSISSIPPI LM | 2,950 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.157581, -96.549824
36.15758, -96.54982 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.