SEVEN #1
API 3503728901 · Creek County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| RED FORK | GAS | 2,290–2,296 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-10-27 | 0 | 150 | 30 | — | 650 | 13/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | R3 | 2,450 | 100 |
| SURFACE | 8 5/8 | 24 | R3 | 222 | 240 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-09-14
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SKINNER | 1,970 |
| RED FORK | 2,280 |
| BARTLESVILLE | 2,410 |
| BROWN LIME /OKLA/ | 2,551 |
| DUTCHER | 2,790 |
| UNION VALLEY | 2,870 |
| CROMWELL | 2,905 |
| WILCOX | 3,371 |
| TYNER | 3,617 |
| ARBUCKLE | 3,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.779742, -96.314297
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.