BADGER #4A
API 3503729501 · Creek County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | GAS | 2,942–2,948 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2023-02-08 | 2 | 25 | 0 | — | 400 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17.5 | J-55 | 3,407 | 225 |
| SURFACE | 8 5/8 | 23 | L.S. | 1,008 | 550 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 18 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2022-10-17
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CLEVELAND | 2,080 |
| BIG LIME | 2,380 |
| SKINNER | 2,660 |
| BARTLESVILLE | 2,940 |
| MISSISSIPPI LM | 3,140 |
| WOODFORD | 3,310 |
| MISENER | 3,340 |
| SIMPSON | 3,350 |
| WILCOX | 3,355 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2022-10-17
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CLEVELAND | 2,080 |
| BIG LIME | 2,380 |
| SKINNER | 2,660 |
| BARTLESVILLE | 2,940 |
| MISSISSIPPI LM | 3,140 |
| WOODFORD | 3,310 |
| MISENER | 3,340 |
| SIMPSON | 3,350 |
| WILCOX | 3,355 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.056550, -96.535960
Every well in Creek County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.