VERA #1
API 3503920350 · Custer County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 620 |
| Nov 2025 | 1,495 | 740 |
| Oct 2025 | 2,040 | 780 |
| Sep 2025 | 1,496 | 760 |
| Aug 2025 | 2,176 | 740 |
| Jul 2025 | 2,177 | 760 |
| Jun 2025 | 2,039 | 720 |
| May 2025 | 2,041 | 750 |
| Apr 2025 | 1,633 | 750 |
| Mar 2025 | 1,629 | 800 |
| Feb 2025 | 953 | 720 |
| Jan 2025 | 484 | 820 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEAC2DNCInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| DOLOMITE WASH | DISP | 4,025–4,155 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 9 5/8 | 47 | P-110 | 3,739 | 565 |
| SURFACE | 13 3/8 | 68 & 55 | J-55 | 4,288 | 1,400 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-02-14
WRAREStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| DOLOMITE | 4,200 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.586568, -99.010097
Every well in Custer County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.