HAMAR #1-14H
API 3503922369 · Custer County, Oklahoma
PANT
Completion
Oklahoma files 1 completion report for this well.
Completion 0
HORIZONTAL HOLEPANTSpudded
2010-08-26
Drilling finished
2010-09-28
Completed
2010-12-08
Total depth
14,074 ft
Operator
UNIT PETROLEUM COMPANY
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CLEVELAND | DRY | 11,261–13,383 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 7 | 26 | P-110 | 11,157 | 370 |
| LINER | 4 1/2 | 11.6 | P-110 | 3,812 | 0 |
| SURFACE | 9 5/8 | 36 | J-55 | 1,506 | 690 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-08-02
WRADRHorizontal holePermit API
35039223690000
Operator
UNIT PETROLEUM COMPANY
Well type
NT
Approved
2010-08-02
Expires
2011-02-02
Proposed depth
15,671 ft
Proposed measured depth
14,074 ft
Proposed true vertical depth
10,764 ft
Proposed lateral
3,334 ft
Surface casing
1,500 ft
Ground elevation
1,621 ft
Target formation
| Formation | Expected top (ft) |
|---|---|
| CLEVELAND | 10,750 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.