COLE #1-11
API 3504322855 · Dewey County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BIG LIME | GAS | 8,810–8,840 | Acid, Frac |
| OSWEGO | GAS | 8,950–8,982 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2020-06-15 | 0 | 76 | 0 | — | 500 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J55 | 9,128 | 215 |
| SURFACE | 8 5/8 | — | J55 | 972 | 405 |
Drilling permits
Oklahoma files 5 applications to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2003-04-14
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 8,803 |
| OSWEGO | 8,959 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2003-04-14
DELRCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 8,803 |
| OSWEGO | 8,959 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2003-04-14
DELRCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 8,945 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2003-04-14
EXTRCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 8,945 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2019-06-04
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 8,810 |
| OSWEGO | 8,950 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.049811, -99.200430
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.