OAKWOOD SWD #1
API 3504323207 · Dewey County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 42,040 | 448 |
| Aug 2025 | 36,302 | 555 |
| Jul 2025 | 134,004 | 520 |
| Jun 2025 | 42,726 | 449 |
| May 2025 | 44,659 | 520 |
| Apr 2025 | 28,333 | 430 |
| Mar 2025 | 15,358 | 365 |
| Feb 2025 | 18,258 | 550 |
| Jan 2025 | 6,623 | 274 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 3 completion reports for this well.
Completion 3
STRAIGHT HOLEAC2DCmIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHASE | COMM DISP | 3,940–4,147 | Acid |
| COUNCIL GROVE | COMM DISP | 4,665–4,817 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | N-80 | 4,658 | 400 |
| CONDUCTOR | 16 | 75 | K-55 | 45 | 7 |
| SURFACE | 9 5/8 | 40 | P-110 | 403 | 350 |
Completion 4
STRAIGHT HOLEAC2DCmIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHASE | COMM DISP | 3,940–4,147 | Acid |
| COUNCIL GROVE | COMM DISP | 4,445–4,465 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | N-80 | 4,658 | 400 |
| CONDUCTOR | 16 | 75 | K-55 | 45 | 7 |
| SURFACE | 9 5/8 | 40 | P-110 | 403 | 350 |
Completion 5
STRAIGHT HOLEAC2DCmIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHASE | COMM DISP | 3,940–4,147 | Acid |
| COUNCIL GROVE | COMM DISP | 4,445–4,465 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | N-80 | 4,658 | 400 |
| CONDUCTOR | 16 | 75 | K-55 | 45 | 7 |
| SURFACE | 9 5/8 | 40 | P-110 | 403 | 350 |
Drilling permits
Oklahoma files 4 applications to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-05-11
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHASE | 3,900 |
| COUNCIL GROVE | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-08-13
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHASE | 3,900 |
| COUNCIL GROVE | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-08-14
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHASE | 3,900 |
| COUNCIL GROVE | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2014-08-14
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHASE | 3,900 |
| COUNCIL GROVE | 4,150 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.911864, -98.675765
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.