FARISS 2-16-20 #1H
API 3504323278 · Dewey County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| TONKAWA | OIL | 8,380–12,690 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-10-08 | 546 | 388 | 980 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | P-110 | 7,620 | 365 |
| LINER | 4 1/2 | 13.5 | HCP-110 | 5,434 | 480 |
| INTERMEDIATE | 9 5/8 | 36 | J-55 | 1,540 | 577 |
| SURFACE | 13 3/8 | 48 | J-55 | 490 | 520 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-04-18
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| WABAUNSEE | 7,600 |
| DOUGLAS | 8,000 |
| TONKAWA | 8,198 |
| COTTAGE GROVE | 8,600 |
| CLEVELAND | 9,539 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.885357, -99.302424
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.