VAN WINKLE #1-5
API 3504323342 · Dewey County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CHEROKEE | OIL | 8,619–8,677 | Acid, Frac |
| CHESTER | OIL | 9,234–9,541 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-01-25 | 54 | 67 | 12 | 43 | 700 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J-55 | 9,642 | 325 |
| SURFACE | 8 5/8 | 24 | J-55 | 844 | 505 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-09-26
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TORONTO | 6,225 |
| TONKAWA | 7,200 |
| COTTAGE GROVE | 7,550 |
| BIG LIME | 8,175 |
| OSWEGO | 8,200 |
| CHEROKEE | 8,560 |
| ATOKA | 8,925 |
| MORROW | 9,190 |
| CHESTER | 9,225 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.069779, -98.825355
Every well in Dewey County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.